Product thumbnail

Model PLB Preformed Loop

Application: 1/4" wide saw cuts, gated facilities

The Model PLB Preformed Loop is a prefabricated loop/lead-in assembly designed to be installed in 1/4“ wide saw cuts. The design allows for variations in the perimeter of the loop slot. There is no need for 45 degree corner cuts. The PLB loop cable, lead-in ca...
Product thumbnail

Model PLH Preformed Loop

Application: Highways - Install under Asphalt Over...

Data Aggregator DA-300™ provides cost effective remote access to realtime traffic data from any isolated or networked intersection or arterial roadway. Easily interfaces with any make or model of traffic cabinet or controller, (NEMA, ATC or Type 170/2070). ...
Product thumbnail

Model PLH-R Preformed Loop

Applications: Direct Burial, Dirt or Gravel Roadwa...

The Model PLH-R Preformed Loop is a prefabricated loop / lead-in assembly designed for use in direct burial applications. Each component of the PLH (loop cable, lead-in cable, and splice enclosure) is designed to maximize durability, minimize water penetration...
Product thumbnail

Model BR-250 Backer Rod (0.375 in. Outside Diam...

For use in 1/8" or 1/4" Saw Slots

The Model BR-250 backer rod (Reno A&E PN 390-0250-00) is installed prior to sealing saw slots. The backer rod holds loop wires and lead-in wires securely in saw slots and keeps loop wires and lead-in wires from floating to the surface when sealant is ap...
Product thumbnail

Model BR-375 Backer Rod (0.5 in. Outside Diamet...

Application: Backer Rod for 1/2 inch Saw Cut Insta...

The Model BR-375 backer rod (Reno A&E PN 390-0375-00) is installed prior to sealing saw slots. The backer rod holds loop wires and lead-in wires securely in saw slots and keeps loop wires and lead-in wires from floating to the surface when sealant is applied. ...
Product thumbnail

Preformed Loop Brackets

For use with the PLH, PLH-R, PLC, and PLC-R Preformed Loops
Product thumbnail

Preformed Loop Support "T"

Reno A&E's Preformed Loop Support "T" is designed to support a preformed loop above the rebar when pouing concrete.It is recommended that the loop is a minimum of 2" above the rebar.